Details: At the Telecom Egypt Club project, we successfully executed a wide range of specialized works. These included landscape development to enhance the outdoor areas and the installation of wet utilities to ensure efficient water supply and drainage. We also constructed the pump room and installed water tanks, ensuring reliable water management for the facility. Additionally, we carried out external façade works to enhance the building’s aesthetic and structural integrity. Each aspect of the project was completed with a focus on quality, sustainability, and long-term functionality, aligning with the club’s operational and design requirements.